How Much Does It Cost To Build A Garage? (2026 Prices Guide): Garage Addition, Detached & Attached

Detached garage builder toronto
Table of Contents

Building a new garage or turning an old one into a functional space  is one of the most valuable upgrades for Ontario homeowners. But the total cost can vary widely based on garage type, size, finishes, and local permit rules.


This guide breaks down garage construction costs in Ontario, including price ranges, permit fees, cost-per-size tables, breakdowns by materials and labour, and real project examples to help you plan your budget confidently.

Average Garage Construction Cost in Ontario: Prices & Permits

Garage construction costs vary across Ontario depending on the city, local permit fees, labour rates, and design complexity. In high-density urban areas like Toronto and Etobicoke, prices tend to be slightly higher because of tighter zoning rules, limited lot space, and more complex permit requirements. Suburban regions such as Aurora, Markham, Richmond Hill, Newmarket, Pickering, and Mississauga often offer more flexibility for garage size, placement, and materials, which helps keep overall costs predictable.

On average, homeowners across these cities can expect a typical garage project to fall between $19,900 and $78,000+, depending on the size (single vs. double), whether the garage is attached or detached, and the level of finishing required. This broad range reflects the diversity of architectural styles, lot conditions, and upgrade options across Ontario.

Here’s a general breakdown based on project level:

Type of GarageApprox. Cost RangeDescription
Basic Single Garage$19,900–$34,000Entry-level build, standard materials, basic slab
Double Car Garage$30,000–$58,000Most popular choice; comfortable space for 2 cars
Detached Garage with Storage/Workshop$35,000–$65,000Includes workspace, electrical upgrades
Attached Garage Addition$40,000–$70,000More complex due to home tie-in & insulation
Garage with Loft / Partial Second Floor$50,000–$85,000+Premium storage, office, or hobby room
Garage Conversion to Living Space$40,000–$95,000+Insulated legal living area, egress, HVAC

Cost by Garage Type (Detached garages VS Attached garages)

The type of garage you choose has a major impact on overall cost. Single-car garages are the most affordable, offering basic shelter and storage with minimal structural or electrical needs. Double-car garages cost more but provide better functionality, space for two vehicles, and room for shelving or small workshop setups. Detached garages typically come at a higher price because they require a separate foundation, independent electrical lines, and full exterior finishing. Attached garages must integrate with the home’s structure and meet fire-separation requirements, adding some complexity but offering greater convenience and insulation.

Single Car Garage Cost in Ontario

  • Size: 12′ x 20′ or 14′ x 22′
  • Cost: $20,000–$34,000
    Good for compact lots and essential storage.

Double Car Garage Cost in Ontario

  • Size: 20′ x 20′ or 22′ x 24′
  • Cost:$30,000–$58,000
    Ideal for families needing extra space

Detached Garage Cost

  • Cost: $35,000–$65,000
  • Usually pricier due to new slab, framing, separate electrical, and roofline.

Attached Garage Addition Cost

  • Cost:$42,000–$70,000
  • Costs more because it must tie structurally into the home.

Garage Cost per Size (Ontario 2026)

Garage size directly influences the total construction cost because larger garages require more concrete, framing materials, roofing, insulation, and labour. A compact 12×20 structure is suitable for basic needs, while sizes like 20×20 or 22×24 offer the extra space most homeowners prefer for storage, tools, and comfortable vehicle access. Bigger garages also give you the option to add workbenches, taller walls, or a small workshop area. As size increases, costs scale proportionally with the additional square footage, which is why most Ontario garage builds come in at roughly $80–$140 per sq.ft. Larger footprints also provide the best return on investment, as they enhance functionality and future-proof the home.

Garage SizeAverage CostNotes
12×20 (240 sq.ft.)$19,900–$32,000Most basic build
14×22 (308 sq.ft.)$23,000–$36,000Slightly more interior room
20×20 (400 sq.ft.)$34,000–$52,000Standard double
22×24 (528 sq.ft.)$38,000–$58,000Larger double
24×30 (720 sq.ft.)$48,000–$75,000With workshop/storage

Cost per sq.ft. for garage construction:
$90–$140 per sq.ft.
(Ontario average)

Garage Building Detailed Cost Breakdown (Material + Labour) 

Garage construction includes several components that shape the final budget. The project begins with the concrete slab, which may need excavation or grading depending on site conditions. Framing determines the structure’s strength, while roofing and exterior finishes must match the home’s style and durability needs. Electrical work ranges from basic lighting to EV-ready or workshop-level wiring. If the garage is attached or intended for year-round use insulation and interior finishing become essential. Each element carries its own cost range, collectively determining the total investment.

Here is a realistic breakdown of where your budget goes in a garage build:

ComponentCost RangeNotes
Foundation / Concrete Slab$4,000–$11,000Thickness, drainage, rebar
Framing (Walls & Roof)$5,000–$16,000Wood prices vary
Roofing (Shingles/Metal)$2,500–$8,000Matching home increases cost
Exterior Siding / Brickwork$3,000–$12,000Vinyl < Fiber Cement < Brick
Garage Door (Single/Double)$1,200–$4,800Insulated doors cost more
Entry Doors & Windows$900–$3,800For ventilation & lighting
Electrical Work$1,200–$4,500Lighting, plugs, 240V for EV
Insulation (If Heated)$1,500–$5,000Required for attached garages
Interior Finishing$1,500–$7,500Drywall, mudding, paint
HVAC / Heating (Optional)$1,500–$5,000Required for conversions
Permits$350–$2,000City dependent

Garage Permit Costs in Ontario

Permits vary by municipality, but here are common ranges:

Permit TypeCost
Garage Construction Permit$350–$1,500
Zoning Review Fee$100–$450
Demolition (if applicable)$75–$350
Development Charges (rare)$0–$3,000+ depending on city

Some cities (Toronto, Mississauga, Markham) may require:

  • Setback checks
  • Lot coverage limits
  • Stormwater management
  • Fire separation standards for attached garages

What Affects Garage Construction Cost 

Several factors influence garage construction pricing in Ontario. Size and layout are the biggest drivers, followed by whether the garage is attached or detached. Material choices like premium siding, insulated doors, or upgraded roofing also affect cost. Electrical requirements, EV chargers, or workshop outlets increase labour time. Site conditions, including slopes or difficult access, can raise excavation and preparation costs. Finally, city zoning and permit rules impact design and engineering needs, making them an important part of project budgeting.

1. Size & Dimensions

Biggest cost factor larger footprint = more materials + labour.

2. Attached vs. Detached

Attached garages are more expensive due to structural tie-ins.

3. Materials Chosen

Siding type, insulation, and roofing dramatically affect the price.

4. Electrical & Heating

Workshops, EV chargers, or heated garages push costs upward.

5. Permit Restrictions

Some cities require engineered drawings or environmental rules.

6. Site Conditions

Sloped lots, excavation, or poor soil adds cost.

Garage Conversion Cost (Garage → Living Space: Office, Gym, or Garage Rental ADU) 

Converting a garage into a livable space is significantly more complex than basic garage construction because it must meet the same building standards as interior rooms. This includes full insulation, vapor barriers, proper HVAC integration, safe electrical systems, and fire-rated walls requirements that often bring the total into the $40,000–$95,000+ range. Depending on whether the space becomes a bedroom, office, gym, or rental suite, homeowners may also need plumbing upgrades, new windows for natural light and egress, and flooring systems that meet code. Garage conversions offer excellent long-term value by adding functional square footage to the home, but they require careful planning to meet Ontario’s building guidelines.

If you’re converting the garage into a legal living area:

Average Conversion Cost:

$40,000–$95,000+

Includes:

  • Insulation
  • Windows & egress
  • HVAC
  • Flooring
  • Electrical
  • Drywall
  • Plumbing (if adding bath)
  • Permit upgrades (fire rating, zoning compliance)

Conversions are more expensive because you’re essentially creating interior living space with higher building-code requirements.

Real Ontario Garage Project Examples

Example 1 — Basic Single Garage

  • Size: 12×20
  • Total Cost: $22,500
  • Included: slab, framing, roof, siding, standard door, basic electrical

Example 2 — Double Detached Garage

  • Size: 20×22
  • Total Cost: $38,000
  • Included: upgraded shingles, lighting, outlets, insulated door

Example 3 — Garage with Small Workshop

  • Size: 24×30
  • Total Cost: $55,500
  • Included: insulation, heater rough-in, 240V outlet, workbench area

Example 4 — Garage Conversion to Bedroom + Office

  • Size: 420 sq.ft.
  • Total Cost: $70,000

Included: interior walls, HVAC, flooring, egress window, drywall

How to Estimate Your Garage Budget (Simple Formula)

Use this quick calculation:

Garage Size (sq.ft.) × $90–$140 = Rough Estimate

Example:
480 sq.ft. (Double Garage)
→ 480 × $100 average = $48,000

Add:

  • Electrical upgrades +$1k–$4k
  • Insulated doors +$800–$1,500

Higher-end siding +$3k–$6k

Final Thoughts + Free Estimate

Garage construction is one of the most value-boosting upgrades Ontario homeowners can make. Whether you want a simple storage space, a full double garage, or a workshop, understanding the cost factors helps you plan without surprises.

Get a free quote

Thank you

name

 We have received your booking request,

a member of our team will be

in touch about your appointment.